Company

Production

Our production site

The production site was built in solid construction, covers nearly 4,000 square metres and was completely insulated with state-of-the-art materials. A new building (Processing Facility 2.0) is scheduled to be built in 2021-22 by purchasing a 25,000 square metre area directly next to Ohrid Airport. The new building will house a laboratory with an extraction plant and a production line for the production and development of THC preparations. It will be the largest production plant in southern Europe. The total investment volume amounts to CHF 23.2 million.

«With heartfelt passion and professionalism, my core team and myself are driving forward innovation in Macedonia for the Swiss company. Our shared goal is clear: changing the future of the pharmaceutical industry sustainably.»

– Goran Maznevski, Chief Technology Officer